I was able to attend Recargo's soft opening of their six charger site in Prunedale, CA (about 100 miles south of San Francisco). Each of the BTC Power chargers are rated at 200 kW on the CCS plug and 100 kW on the CHAdeMO plugs. According to the Recargo representative who was onsite, the could eventually up the output power to 400 kW.
Exciting times.
Exciting times.