GM Volt Forum banner
1 - 1 of 1 Posts

·
Registered
Joined
·
43 Posts
I did all my electrical install myself 240V 15AMP double pole breaker and all exterior weatherproof box and conduit, took me about 35 min start to finish the wifes volt charges way faster than the first couple days plugged in to our 110, My panel was already 200AMP service
 
1 - 1 of 1 Posts
Top