http://www.mdot.maryland.gov/News/Releases2017/2017_Nov_16_Electronic_Vehicle_Chargers_Unveiled
Looks like 4 CCS/CHAdeMO fast charging stations were installed at the Maryland House and Chesapeake House rest areas in NE Maryland, along with Tesla Supercharger stations as well. Welcome addition, though what we really need is for EVgo to turn back on those CCS stations installed on the NJTP that have been offline for almost 3 months now! WTF! Those were perfectly located for my semi annual trips to CT taking the Bolt.
Looks like 4 CCS/CHAdeMO fast charging stations were installed at the Maryland House and Chesapeake House rest areas in NE Maryland, along with Tesla Supercharger stations as well. Welcome addition, though what we really need is for EVgo to turn back on those CCS stations installed on the NJTP that have been offline for almost 3 months now! WTF! Those were perfectly located for my semi annual trips to CT taking the Bolt.